LRG Holdings/Solar IPP/Lobatse, Botswana

Lobatse Leather Park
Solar Project.

A proposed 30-33 MW solar IPP supporting Botswana’s meat and leather value chain in Lobatse.

Co-located with the Leather Park and BMC facilities. Designed under the BPC grid connection framework and BERA IPP licensing regime.

Capacity

30-33 MW

Location

Lobatse, Botswana

Framework

BPC + BERA

Phase

Pre-feasibility

01 / Project Pillars

Power, regulation, offtake.

Four load-bearing components, each anchored to Botswana’s established IPP and PPA framework.

0130-33 MW

Generation Capacity

Proposed 30-33 MW solar installation co-located with the Lobatse Leather Park and BMC anchor facilities.

02Dual offtake

Power Offtake

Direct supply to the Leather Park tannery, finishing and manufacturing lines. Surplus exported to BPC grid under IPP framework.

03BPC framework

Grid Interconnection

BPC grid connection enquiry and interconnection study. Designed to BPC technical standards from inception.

04BERA-licensed

Regulatory Licensing

BERA (Botswana Energy Regulatory Authority) IPP generation licence under Botswana's established IPP and PPA frameworks.

02 / Approval Pathway

Regulatory roadmap.

Each step must be completed before construction can begin. Status as of current structuring phase.

01In Progress

BPC Grid Connection Enquiry

Application to Botswana Power Corporation for grid connection assessment and interconnection study.

02In Progress

Pre-Feasibility Study

Technical and financial pre-feasibility covering solar generation, storage options, and grid integration.

03Proposed

EIA Screening

Environmental Impact Assessment for solar development and supporting infrastructure.

04Proposed

BERA Licensing Review

Regulatory review with Botswana Energy Regulatory Authority for IPP generation licence.

05Next Step

Offtaker Engagement

Engagement with BPC and Leather Park tenants for Power Purchase Agreement (PPA) structuring.

06Next Step

EPC Partner Selection

Selection of EPC contractor, technology partners and co-investors for Phase 1 execution.

03 / Strategic Value

Why solar, why now.

Industrial Power

Reliable, low-cost power for tannery, finishing and manufacturing operations

ESG Credentials

Renewable energy backing strengthens ESG positioning for luxury buyer compliance

Grid Revenue

Surplus generation sold to BPC under IPP framework — second revenue line

Cost Stability

Long-tenor PPA insulates the Leather Park from grid tariff inflation

Carbon Reporting

ISO 14064 alignment and Higg FEM-compatible emissions baseline from day one

Cluster Effect

Anchor power infrastructure attracts downstream industrial tenants to the SEZ

Transparency Note

The solar project is in pre-feasibility and structuring phase. No construction, generation licence or PPA has been signed. All figures are indicative pending feasibility study and BPC interconnection assessment.

Engage

IPP capital, EPC partners and offtakers welcome to engage.